Engineers analyze different castings, design pouring and risers scientifically and rationally, and design mature and perfect processes.
Production process
The company is equipped with two modified water glass automatic production lines and one lost foam production line. It provides customers with diversified choices.
heat treatment
The company uses a new type of forklift to enter the water, and the casting entry speed is controlled within 30 seconds.
The company is equipped with two German direct reading spectrometers and a professional physical and chemical laboratory. The physical and chemical performance testing of the products can be done very accurately.